Submit Project for Technical Review
Tell us about the program and paste a link to your CAD files (Google Drive, Dropbox or similar), or email STEP or IGES files to brandon@tkmold.com. The more you include, the faster and more accurate the DFM and quote.
What Happens After You Submit Your RFQ
Your package goes to a toolmaker first, not a sales queue. Brandon makes sure it is complete enough to quote, then hands it to TK’s engineers at the end of the U.S. day, which is the start of the next working day in Shenzhen. TK runs DFM and a Moldflow study, done by analysts certified at Gold, Silver and Bronze level, and the report and quote come back through Brandon.
Swipe sideways to see the whole figure.
Figure 1. The path of an RFQ from your team to TK and back. Times shown are an example on Eastern Daylight Time, when Shenzhen is 12 hours ahead.
- You send the package3D CAD, 2D print, resin, volume and your press and plant standards, through the form, email or WhatsApp.
- Brandon checks itHe confirms he has your files, makes sure an NDA is in place and asks for anything missing before it goes to TK.
- TK DFM and MoldflowTK’s engineers review draft, walls, gating, parting line and cooling, and run a Moldflow fill study.
- DFM report and quoteThe quote states the mold build, cavitation, runner, steel and standards it is based on, so you can compare it line by line.
- Review callBrandon goes through the DFM findings and quote with your team by phone or screen share and settles the open points with TK.
What to Include With Your RFQ
A quote is only as good as the information behind it. Without press data and volumes, a quote often has to be revised once they arrive. Send what you have; Brandon will ask for the rest.
01Part data
- 3D CAD in STEP, IGES, Parasolid or native
- 2D print with critical dimensions and tolerances
- Cosmetic surfaces, texture and gate vestige limits
02Material and volume
- Resin grade, colorant and any fillers
- Annual volume and program life
- Target cavitation and cycle time, if you have them
03Your press
- Make, tonnage and shot size
- Tie bar spacing, platen size and bolt hole pattern
- Locating ring, nozzle radius and ejector pattern
04Plant standards
- Mold standard or steel requirement, if any
- Hot runner brand and controller connectors
- Water fittings, components and spare parts needs
05Delivery
- Delivery address and Incoterms
- Required ship date and trial sample needs
- Who attends the trial: in person or online
Want a full list you can fill in? Use the RFQ Checklist and sheet builder.
Frequently Asked Questions About Requesting a Quote
Who will I be talking to?
Do you sign our NDA before we send files?
What file formats can I send?
What does the DFM review cover?
How does the 12 hour time difference affect my quote?
Can I contact you about a TK mold already running in my plant?
Can we visit TK or watch the mold trials?
Prefer to Talk It Through First?
Call or message Brandon during U.S. business hours. He can tell you what TK needs to quote your part, whether the program fits TK, and what to expect on timing before you send a single file.