Capability Map

TK Capabilities at a Glance

Every capability below has its own page with the details, the TK examples and a planning tool. Pick the one that matches your program, or use the mold program planner further down to get pointed to the right ones.

Industries TK Tools For

Program Flow

From RFQ to Start Up: How a TK Mold Program Runs

Most of the risk in an offshore mold is in the handoffs: between your engineers and the toolmaker, between design and the steel, and between the trial in China and the start up in your plant. TK runs the program in one sequence with one project manager, and TK’s project managers average 15 years with the company.

Figure 1: Ten Steps from RFQ to Start Up, and How Long the Build Takes
Each step lights up in order. Below, TK’s typical build time of 3 to 6 months against 8 to 18 months at many EU and US toolmakers, with two documented TK builds marked from PO to shipment.
Ten steps in TK’s mold program: RFQ and ESI, DFM and Moldflow, mold design, design review, steel and incoming inspection, machining, fitting and in process inspection, first trial, measurement and optimization, and shipment with start up support. Below, TK’s typical build time of 3 to 6 months compared with 8 to 18 months at many EU and US toolmakers. ENGINEERINGBUILD AND PROVE 1 RFQ and ESI Quote, early supplierinvolvement, capacity check 2 DFM and Moldflow Wall, gates, cooling andwarpage checked before steel 3 Mold design UG NX with a built instandard component library 4 Design review Checked by TK, approved byyou; weekly progress reports 5 Steel and IQC Steel from ASSAB, GMH orSchmolz+Bickenbach, then tested 6 Machining 5 axis CNC, EDM and wire,inserts held to 0.002 mm 7 Fitting and IPQC Inserts fit without handmatching; in process checks 8 First trial (FOT) Ten step scientific trialon TK presses 9 Measure and optimize 100% CMM, DOE, ECRand changes before SOP 10 Ship and start up Vacuum packed and turnkey,TK PM at your start up BUILD TIME, MONTHS 0369121518 TK typical build3 to 6 months Many EU and US toolmakers8 to 18 months 10 weeks: 72 cavity cap mold 16 weeks: 32+32 stack mold Documented TK builds shown as markers; times run from PO to shipment.
10 weeksPO to shipment for a 72 cavity cap mold
10 weeksPO to shipment for a 12+12 two shot cap mold
16 weeksFor a 32+32 stack mold
6 monthsFor twelve 128 cavity molds
Precision Toolmaking

Built to Demanding North American and European Standards

TK machines molding inserts to 0.002 mm in temperature and humidity controlled workshops, so parts are held to the machining data and inserts go together without hand matching or flying the mold. That is what makes cavities interchangeable on a 128 cavity mold and what keeps a spare insert a drop in replacement years later.

TK Group Mold Making Equipment

MachineQty
CNC milling machines125
5 axis CNC milling machines21
EDM machines62
Wire EDM22
Grinding machines and CNC jig grinders59 + 5
High precision hard turning and lathes3 + 7
CMM21
Trial presses, 2K included18 (6 are 2K)
Flexible automatic production lines8

From TK Holdings’ 2026 presentation. Machine brands in TK’s shops include Röders, Yasda, Makino, Agie Charmilles, Hauser and Studer.

Rows of polished machined core inserts with engraved part numbers and graduation marks for syringe molds
Machined core inserts with engraved graduations for syringe molds.
Orange robot on a floor track serving enclosed machining cells on a TK flexible automatic line
One of TK’s flexible automatic machining lines.

Steel, Components and Hot Runners

  • Tool steel from ASSAB, GMH Gruppe and Schmolz+Bickenbach, checked on arrival by spectral analysis and hardness testing.
  • Standard components from HASCO, DME and Meusburger, the same catalog parts North American mold shops already stock.
  • Hot runners from Synventive, HRS, Incoe and Milacron, matched to the resin and the gate.
  • Mold base and plate work on machines with up to 3.2 m by 3.0 m by 0.8 m of travel in TK’s automotive tool shop.

See the custom injection mold tooling page for steels, mold classes and build options.

TK mold fitting floor with mold plates and inserts on benches, toolmakers at work and overhead cranes
TK mold fitting and assembly floor.
Thermal Control

Conformal Cooling with 3D Metal Printing, and RHCM

Straight drilled water lines cannot follow a deep core or a curved wall, so the steel runs hot where the line cannot reach and the cycle waits for it. TK prints cooling inserts in house with channels that follow the part, and uses rapid heat cycle molding where the surface has to come out of the mold finished.

Conformal Cooling at TK

  • In house printing on a 3D Systems DMP 350 in maraging steel 1.2709, 33 to 37 HRC as built and 50 to 56 HRC age hardened, polished to SPI A2.
  • Up to 35% shorter cycles, with less warpage from even cooling.
  • Documented: a 12+12 two shot flip top cap mold went from 21 s to 17 s.
  • Print size up to 275 by 275 by 420 mm per insert, and diffusion welded inserts as a second route.

More on the conformal cooling page, with a savings calculator.

TK 3D printing engineering technology center with a wall display of conformal cooling channels and printed parts in glass cases
TK’s 3D printing engineering technology center.
RHCMRapid heat cycle moldingThe cavity surface is heated before injection and cooled after fill, for a high gloss finish, thin walls and fewer weld lines and stress marks.
RoctoolInduction heated surfacesListed by TK among its emerging automotive technologies, alongside RHCM.
High glossDedicated tool roomSince 2017 TK has run a specialized tool room for 2K, pre distortion and high gloss molds.
Multi Component Precision

2K and 3K Multi Shot, LSR, Insert Molding and IMSE

Molding two materials in one mold removes a bonding or assembly step and puts the soft grip, seal or second color exactly where the design wants it. TK builds the molds and runs them: 60 of TK’s molding presses are 2K, 3 are 3K and 32 run liquid silicone rubber.

  • 2K and 3K: hard and soft bonding for grips and seals, and two color parts, with multi shot molds run on TK’s own 2K presses. More on the multi shot page.
  • LSR overmolding onto engineering plastic, metal or glass.
  • Insert molding of metal, glass, ceramic and circuit board inserts, sealed to IP68 with air leakage control up to 7 bar.
  • Injection compression to lower internal stress and even out wall thickness.
  • IML and IMD for dead front panels, graphics, waterproof windows and conductive circuits.
Trial video of TK 2K mold TM36772, molding clear caps with a blue second shot.

In Mold Structural Electronics (IMSE)

With IMSE, developed with TactoTek, circuits and components are printed and mounted on a film, the film is formed, and plastic is molded around it. TK’s IMSE example compares a conventional electronics assembly with the molded part:

64 parts → 1Plus a small PCBA, instead of 64 parts, a large PCBA and 20+ molds
45 mm → 3 mmAssembly depth to molded thickness
650 g → 150 gWeight
25% lessTotal cost of ownership
60% lessCO2 equivalent
Production

Molding, Secondary Processes and Production Bases

TK does not hand the mold off and walk away. The same group molds, decorates and assembles parts on 503 presses, most of them high speed and electric machines from Europe and Japan, and runs 7,000 tons of resin a year through them. For large automotive molds TK tries out on presses up to 2,800 T.

Under 100 T
65
100 to 200 T
346
200 to 300 T
52
Over 300 T
40

Molding presses by clamp force, 503 in total. By type: 343 horizontal, 40 vertical, 60 two shot, 3 three shot, 32 LSR and 25 high speed.

BaseWorkPeopleFloor space
Shenzhen, ChinaMold making (2,000+ molds a year), molding, spray painting, secondary processes3,600180,000 m²
Huizhou, ChinaMolding, LSR molding, spray painting55038,000 m²
Suzhou, ChinaMold making, molding, secondary processes40023,000 m²
Vietnam, near HanoiMolding, tool repair, secondary processes20010,000 m²
Spray painting4 automatic spindle lines450 to 560 m long, 3 painting and 3 baking stations, a Class 100K clean room and a Class 10K clean spray booth.
PrintingPad, silk, offset and digital6 color offset printing, digital printing and foil stamping.
FinishingNCVM, laser and weldingNCVM, lamination, laser etching, ultrasonic welding, CNC shaping, polishing and fabric wrapping.
AutomationLean automationIn mold placement, assembly, inspection and secondary processing.
ProductionContract moldingFrom prototype through EVT, DVT and PVT to ramp up. See contract injection molding.
ServiceRepair and sparesTool repair and spare parts service, with tool repair also at TK Vietnam.
Scale model of a TK campus with office towers and long factory halls displayed in TK's showroom
Scale model of a TK campus in TK’s showroom.
Quality Documentation

Quality, Labs and Certifications

TK inspects 100% of critical dimensions on CMM with a pass rate of 99.8% or better, and has held CPK above 1.67 on 200+ control dimensions of precision molds. The lab covers dimensional, electrical, appearance, reliability and material testing, including CMM, CT, white light interferometry, salt spray, thermal shock and drop testing.

ISO 9001Since 1999
UL E126118Since 1999
ISO 14001Since 2006
ISO 13485Since 2010
ISO 45001Since 2018
GMP StatementSince 2019
IATF 16949Since 2021
AEOSince 2023
Coordinate measuring machine in a TK metrology room with the TK logo on the gantry
CMM in a TK metrology room.

What TK’s Lab Tests

  • Dimensional: CMM, OMM, CT, profile scanner, white light interferometer, roughness and coating thickness.
  • Electrical: vector network analyzer, resistance scanner, battery testing and DC low resistance.
  • Appearance: CCD inspection, color, gloss and lens transmittance.
  • Reliability: xenon arc, UV aging, thermal shock, temperature and humidity, salt spray, drop and vibration.
  • Mechanical and material: push pull, torque, ball impact, abrasion, hardness, melt flow index, moisture, XRF and infrared spectroscopy.

TK publishes an ESG report each year, holds ISO 14064 carbon verification, was rated B in the CDP 2025 climate assessment and is in the top 35% of companies rated by EcoVadis. Full details on the quality and certifications page.

Planning Utility

Interactive Mold Program Planner

Enter your annual volume, the cycle time you expect and how many hours the mold will run. The planner works out how many cavities you need, picks a practical cavity layout, shows the spare capacity it leaves, and points you to the TK capabilities that fit your part. Open “Show the math” to check every step.

1Demand
2The molding cycle
Uptime times good parts. 85% is a common planning figure.
3The part
Anything special?
Cavities you need
0
Suggested layout
Capacity against your demand
TK capabilities that fit
Show the math
    Send my program plan to Brandon

    A first estimate for planning. The cavity layouts are common practice, not a TK quote. Cycle time, the right cavitation and the mold type are set in DFM with Moldflow, and depend on part size, wall thickness, resin and the press. Default numbers are an example only.

    Frequently Asked Questions

    Technical Sourcing FAQ: TK Capabilities

    What does TK do in house?+
    Everything from DFM and Moldflow through mold design, steel machining, fitting and scientific trials, to production molding, spray painting, printing, NCVM, laser etching, ultrasonic welding and assembly. Molds are built in Shenzhen and Suzhou, and parts are molded in Shenzhen, Huizhou, Suzhou and Vietnam.
    How long does a TK mold take to build?+
    TK’s typical build is 3 to 6 months depending on size and complexity, compared with 8 to 18 months at many EU and US toolmakers. TK has documented 10 weeks from PO to shipment for a 72 cavity cap mold and a 12+12 two shot cap mold, 16 weeks for a 32+32 stack mold, and twelve 128 cavity molds in 6 months.
    What tolerances can TK hold?+
    Molding inserts are machined to 0.002 mm. On precision molds TK has held CPK above 1.67 on more than 200 control dimensions, and inspects 100% of critical dimensions on CMM with a 99.8% or better pass rate. Part tolerances depend on the resin and the design, and are set in DFM.
    Which steels, components and hot runners does TK use?+
    TK’s supply chain includes tool steel from ASSAB, GMH Gruppe and Schmolz+Bickenbach, standard components from HASCO, DME and Meusburger, and hot runners from Synventive, HRS, Incoe and Milacron. The steel grade and hot runner for each mold are chosen in DFM for the resin, the volume and your plant’s standards.
    Can TK mold the parts, or only build the mold?+
    Both. TK can run production on its 503 molding presses with painting, printing and assembly, or ship the mold to your plant vacuum packed and turnkey with its documents, and send a project manager for start up. TK also offers tool repair and spare parts service.
    Which certifications does TK hold?+
    ISO 9001 since 1999, UL (E126118) since 1999, ISO 14001 since 2006, ISO 13485 since 2010, ISO 45001 since 2018, a GMP statement since 2019, IATF 16949 since 2021 and AEO customs certification since 2023, plus ISO 14064 carbon verification.

    Request an Upfront Engineering and DFM Review

    Send your 3D CAD model, resin and annual volume to Brandon Henderson, Technical Sales Support Manager for the Americas. He will review draft, gating, cooling and cavitation with TK’s engineers and come back with a mold plan.

    Submit 3D CAD for Review See TK Mold Trials